|
26-1171
| 1. | Consider appeal of Planning Commission’s technical denial of Classified Conditional Use Permit (CUP) Application Nos. 3666 and 3667 and associated Environmental Impact Report (EIR) (State Clearinghouse No. 2020060123) to allow modification of an existing surface mining operation in two stages with continued operation of the ready-mix concrete plant with addition of a modern asphalt plant; If appeal is granted and Planning Commission’s denial of CUP Nos. 3666 and 3667 is overturned: a. adopt a Resolution certifying the Final EIR for the Cemex Rockfield Expansion Project including adoption of California Environmental Quality Act (CEQA) Findings of Fact and Statement of Overriding Considerations for EIR No. 7763 prepared for CUP Nos. 3666 and 3667 and adopt Mitigation Monitoring and Reporting Program as complete and adequate in conformance with the CEQA; b. find that Alternative 4 with a 63-year maximum mining life and a maximum mining depth of 300 feet for the Quarry Site is consistent with Fresno County General Plan policies addressing conservation of mineral resources, orderly mining | | |
None
|
None
|