Fresno County CA header
 
File #: 16-1012    Name: Right-of-Way Acquisition for Bethel Avenue and Manning Avenue Traffic Signal Project
In control: Public Works & Planning
On agenda: 8/9/2016 Final action: 8/9/2016
Enactment date: Enactment #:
Title: Accept the easement deeds and authorize the Chairman to execute the right-of-way contracts and temporary construction permits required for the installation of a traffic signal at the intersection of Bethel Avenue and Manning Avenue for a total monetary consideration of $3,100.
Attachments: 1. Agenda Item, 2. Location Map, 3. Exhibit A, 4. Right-of-Way Contracts, 5. Grants of Easement, 6. Temporary Construction Permits

DATE:                     August 9, 2016

 

TO:                     Board of Supervisors

 

SUBMITTED BY:                     Steven E. White, Director

                     Department of Public Works and Planning

                     

SUBJECT:                     Right-of-Way Acquisition for Bethel Avenue and Manning Avenue

                     Traffic Signal Project - Federal Project No. HSIP-5942(230)

 

RECOMMENDED ACTION(S):

TITLE

Accept the easement deeds and authorize the Chairman to execute the right-of-way contracts and temporary construction permits required for the installation of a traffic signal at the intersection of Bethel Avenue and Manning Avenue for a total monetary consideration of $3,100.

REPORT

Approval of the recommended action will authorize the purchase of additional right-of-way and temporary construction permits required to install a six-phase traffic signal with protected left turn phasing at the intersection of Bethel Avenue and Manning Avenue (shown on Exhibit A, attached).

 

ALTERNATIVE ACTION(S):

 

The Board may reject the purchase of this right-of-way. This would prevent the County from obtaining the necessary right-of-way to proceed with the project.  If the necessary right-of-way is not acquired, the project will be cancelled and funding previously received for the project would have to be returned.

 

FISCAL IMPACT:

 

There will be no Net County Cost associated with the recommended action. A warrant or check will be drawn on Fund 0010, made payable to the individual grantors listed below.  This project is eligible for reimbursement under the Highway Safety Improvement Program (HSIP). The HSIP will provide up to 90 percent of the funding for the right-of-way purchase.  The remaining costs will be paid out of the Road Fund.  Sufficient funds for this transaction are included in the FY 2016-17 Public Works and Planning - Roads Org 4510 Adopted Budget.

 

The property owner names, address and the basis of the compensation associated with these parcels are as follows: Parcels 4 & 5 - Frank R. Miramontes and Lorenza P. Miramontes, Trustees, 8865 S. Bethel Avenue, Selma, CA 93662 - $3,100. This payment is for 0.069 acres in road easements, two temporary construction permits, landscaping orange trees, irrigation and severance damages to the remainder, if any.

 

Of the total compensation provided pursuant to this agenda Item, $68 is for two temporary construction permits with a useful life of 12 months each, and $3,032 is for two permanent roadway easements.

 

DISCUSSION:

 

This project consists of installation of a new six-phase traffic signal with protected left-turn phasing on Manning Avenue and widening of Bethel Avenue to construct left turn pockets. Manning Avenue is a divided, four-lane roadway with left turn pockets.  Bethel Avenue is a two-lane roadway and traffic is currently stop-controlled.

 

It is anticipated that construction will commence in the spring of 2017.

 

REFERENCE MATERIAL:

 

BAI#38, November 9, 2010

BAI#24, July 17, 2012

BAI#63, May 10, 2016

 

ATTACHMENTS INCLUDED AND/OR ON FILE:

 

Location Map

Exhibit A

On file with Clerk - Right-of-Way Contracts

On file with Clerk - Grants of Easement

On file with Clerk - Temporary Construction Permits

 

CAO ANALYST:

 

John Hays