Title: 1. Adopt plans and specifications and award Contract No. 17-23-C, SB-1 (RMRA) Asphalt Concrete Overlays to the low bidder, Cal Valley Construction, 5125 N. Gates, Suite 102, Fresno, CA 93722, in the amount of $4,626,757.30 for the base bid and all the additive bids. 2. Authorize the Director of the Department of Public Works and Planning, or designee, to execute Contract Change Orders up to $210,000 which is approximately 4.5% of the total contract construction cost, the limit allowable under California Public Contract Code, section 20142 for Contract 17-23-C.
Attachments: 1. Agenda Item, 2. Location Maps, 3. Contract No. 17-23-C, SB-1 (RMRA) Asphalt Concrete Overlays (executed contract).pdf
DATE: June 12, 2018

TO: Board of Supervisors

SUBMITTED BY: Steven E. White, Director
Department of Public Works and Planning

SUBJECT: Contract 17-23-C, SB-1 (RMRA) Asphalt Concrete Overlays

RECOMMENDED ACTION(S):
TITLE
1. Adopt plans and specifications and award Contract No. 17-23-C, SB-1 (RMRA) Asphalt Concrete Overlays to the low bidder, Cal Valley Construction, 5125 N. Gates, Suite 102, Fresno, CA 93722, in the amount of $4,626,757.30 for the base bid and all the additive bids.

2. Authorize the Director of the Department of Public Works and Planning, or designee, to execute Contract Change Orders up to $210,000 which is approximately 4.5% of the total contract construction cost, the limit allowable under California Public Contract Code, section 20142 for Contract 17-23-C.
REPORT
Approval of the first recommended action will authorize the award of a budgeted road improvement project. Approval of the second recommended action will allow the Director of the Department of Public Works and Planning, or designee, to execute change orders up to the statutory limit. This item pertains to multiple locations in Districts 1, 4, and 5.

ALTERNATIVE ACTION(S):

If the first recommended action is not approved, the project will be delayed. If the second recommended action is not approved, the Director's, or designee's, authority to approve Contract Change Orders will be limited to $71,267.

FISCAL IMPACT:

There is no Net County Cost associated with the recommended actions. The anticipated cost of the project, based on the low bid and including an allowance for contingencies, is $4,836,757 (contract plus change orders). The project will be paid for out of the Road Maintenance and Rehabilitation Account (RMRA) under Senate Bill (SB) 1 and sufficient appropriations are included in the Department's Org 4510 FY 2017-18 Adopted Budget.

DISCUSSION:

The work to be done consists, in general, of furnishing and placing hot mix asphalt (HMA) concrete type A overlay on...